Structure moving

When moving any type of building, be sure to make it a safe move. Contact MiEnergy Cooperative at least two weeks prior to the move if the structure you're moving is more than 15 feet tall when loaded. Trained linemen will assist you with the move and create a safe distance between the structure and the power lines. Do not attempt to try this on your own. It is very dangerous and could result in serious or fatal injury. If you're planning on moving a structure more than 15 feet tall loaded, please download the following fillable PDFs and return to MiEnergy.

Structure Move Agreement and Procedures

Structure Move Work Request

For more information about structure moves in Iowa, contact:   For more information about structure moves in Minnesota, contact:
Rick Hagen
Director of Operations
  Mike Ebner
Director of Operations